The Architectural Board, an official arm of the Developers of Liddon
Hills Subdivision, will exercise its sole authority and responsibility
for granting or denying approvals. When needed, professionals in
the fields of real estate, design, landscaping, engineering, and
related fields, will be consulted by the Architectural Board. Decisions
made by the Architectural Board will be binding upon the lot owner,
in accordance with the Protective Covenants of
Liddon Hills Subdivision, Phase I.
In the event that the Architectural Board or the Developers fail
to approve or disapprove a complete submittal within a period of
thiry days after the said plans and specifications have been delivered
to it, or if no litigation to enjoin the erection of such building
or the making of such alterations has been commenced prior to the
completeion thereof, such approval will
not be required and Paragraph 11, of the Protective Covenants of
Liddon Hills Subdivision, Phase I, will be deemed to have been fully
complied with.
SUBMITTAL CONTENT
All Complete Submittals must include the following:
1.) Submittal Informations Sheet (copy enclosed), filled-in
as completely as possible.
2.) Complete Set of House Plans including:
SITE PLAN Showing:
a.) Location of all improvements on the site.
b.) Details of all improvements (drive, walks, fences,
patios, courts, pools, decks, out-buildings, etc.)
c.) Elevations & Drainage details.
d.) Proposed location of Hydromatic Grinder Pump.
e.) Sample sketch or idea of Landscape Design, if
available; and
FINAL WORKING DRAWINGS Showing:
Floor plans, elevations, & exterior details, as
well as electrical & plumbing details.
(All drawings that constitute contract documents)
All plans submitted to the Board should be the same
that would be submitted for a building permit.
Color samples or swatches of exterior materials to be
used, such as paint or stain colors, etc., may be requested
by the Liddon Hills Architectural Board.